The flexibility of panel systems allows you to utilize them in most any environment, but if at all possible the planning phase should begin when the building plans are being made. Electrical, HVAC and lighting needs for the cubicles can be best laid out at this time.
Making sure all of these are optimized for your needs and having all of your utilitarian requirments in place will save you money.
Layout for Progressive Reception Workstation

Fortunately this client planned all furniture placement before construction began.The electrical layout for this reception station was chosen for the cleanest look. The electrical input could be placed from the wall, but then it would be visible from the front entrance and from the hallway behind it. The panels would not be able to be installed flush with the wall (see photo above), therefore coming from the floor was the better solution.
Copyright 2011 Donna LaForge Interiors. All rights reserved.
Donna LaForge Interiors
3333 Arkansas Rd.
West Monroe, LA 71291
ph: 318-791-2068
donna